acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/dev.hartzellprop.com/www/wp-includes/functions.php on line 6121Due to their critical nature, certain tasks in the overhaul process require evaluation by Hartzell to ensure they are being performed correctly. Hartzell inspects and evaluates samples of the processes and operations from propeller repair facilities from around the world. If a repair facility’s sample is found to be acceptable they are added to the sample program approval listing for that operation. We recommend that if you are using a propeller shop that is not a Hartzell Recommended Service Facility (RSF) that you confirm that the shop has appropriate approvals. The following tasks require evaluation and approval by Hartzell:
To open PDF documents, the free Adobe Reader is required. Click here to download and install it.
| Title | Date | Description |
|---|---|---|
| Cold Compression Rolling | Sept. 2025 | Listing of approved facilities for cold rolling |
| Composite Blade Major Repair and Erosion Shield Replacement |
Sept. 2025 | Listing of approved facilities for composite blade O/H |
| MV Blade Shank Modification | Sept. 2025 | Listing of approved facilities for MV shank modification |
| Shot Peening | Sept. 2025 | Listing of approved facilities for shot peening |
| Pitch Change Knob Shot Peening | Sept. 2025 | Listing of approved facilities for shot peening of pitch change knob |
| Steel Hub Mounting Flange Rework | Sept. 2025 | Listing of approved facilities for steel hub flange rework |